Product Details:
Payment & Shipping Terms:
|
Product Name: | 3 Axle Semi Trailer | Suspension: | Mechanical Suspension(leaf Spring), Or Air Bag. |
---|---|---|---|
Tank Material: | Q345R, Q370R, 16MnDR Carbon Steel | Tank Volume: | 30M3, 40M3, 42M3, 45M3, 50M3, 55M3, 60M3 |
Landing Gear: | JOST Brand 28Ton | Tire: | 12R22.5 Tubeless Tire With One Spare |
Application: | Liquid Petroleum Gas Transport, Pressure Vessel | NO. Of Axle: | 2 Axles, 3 Axles, 4 Axles |
Key Parts: | Loading / Unloading Valves, Manhole, Safety Valve, Emergency Valve Etc | ||
Highlight: | flatbed semi trailer,container semi trailer |
A. Advantage:
1. Axles coule be BPW or FUWA, with first axle liftable;
2. Suspension to be air suspension;
3. Tyre could be Double Coin brand;
4. Volume as per your requirement.
Tanker Essential Information | |
Volume of Tank (cbm) | 50cbm (50000 Liters) |
Overall Dimensions(L*W*H)(mm) | 12840*2500*3975 |
Tank Dimensions(Inner Diameter*thickness*Length) | 2300*12*12454 |
Estimated Tare Weight (kg) | 15300 |
Payload(kg) | 25000 |
Total Weight(kg) | 40300 |
Wheelbase(mm) | 6800+1310+1310 |
Shell of Tanker | |
Products | Liquefied Petroleum Gas (propane) |
Fluid Property | Flammable |
Design Temperature(℃) | 50℃ |
Design Pressure(MPa) | 1.61 |
Corrosion Allowance(mm) | 1.00 |
Weld Joint Factor | 1 |
Major Materials of Bearing Pressure | Tanker body:Q345R, 12mm |
End plate: Q345R, 12mm , double ellipse | |
Main beam:16Mn | |
Detection | |
Heat Treatment | Overall treatment in a furnace,600℃ to 640 ℃ |
Flaw Detection | 100% Flaw detection |
Hydraulic Test(MPa) | 2.1 |
Manhole (As Customer’s Requirement) | |
Quantity | 1;on top,DN450 |
Safety Valve(As Customer’s Requirement) | |
Quantity | 2 |
Location | On the top of tanker |
Size | DN50 or As Customer’s Requirement |
Level Gauge 3*13T Fuwa |
|
Type | Manuel Operation type |
Location | At the rear of the end plate |
Running System | |
Axles | 3*13T FUWA brand |
Tire | 12R22.5 Tubeless tire , 13 including one spare tire |
Landing leg | JOST |
King Pin | #50 or #90 |
Control System | |
Emergency Cut-off Valves | 2 |
Ball Valve | 2 |
Liquid Gauge | 1 |
Pressure Indicating Thermometer | 1 |
Pressure Gage | 1 |
Accessories | |
Tool Box | 2 |
Wheel Carrier | 1 |
Fire Extinguisher | 2 |
Fender | 6 |
Paint | As Customer’s Requirement |
Standard: Pressure vessels, Supervision Regulation on Safety Technology for Stationary Pressure Vessels |
The picture of LPG tank trailer.
Detailed equipment of LPG Trailer:
Tools box and tire protect Kingpin
valve protect box.
Wire Line Protect pipe spare tire hodler Frame shape
frame and body connector spring suspension rear bumper and lighter