Product Details:
Payment & Shipping Terms:
|
Axle Brand: | BPW, FUWA, L1, HJ Etc | Suspension: | Mechanical Suspension , Or Air Bag. |
---|---|---|---|
Tank Material: | Q345R, Q370R, 16MnDR Carbon Steel | Tank Volume: | 30M3, 40M3, 42M3, 45M3, 50M3, 55M3, 60M3 |
Landing Gear: | JOST Brand 28Ton | Tire: | 12R22.5 Tubeless Tire With One Spare |
Application: | Liquid Petroleum Gas Transport, Pressure Vessel | NO. Of Axle: | 2 Axles, 3 Axles, 4 Axles |
Key Parts: | Loading / Unloading Valves, Manhole, Safety Valve, Emergency Valve Etc | Loading Capacity: | 15Ton, 20Ton, 25Tons, 30Tons. |
High Light: | small tanker truck,gas tank trailer |
A. Advantage:
1. Axles coule be BPW or FUWA, with first axle liftable;
2. Suspension to be air suspension;
3. Tyre could be Double Coin brand;
4. Volume as per your requirement.
Tanker Essential Information | |
Volume of Tank (cbm) | 40 |
Overall Dimensions(L*W*H)(mm) | 11324*2500*3730 |
Tank Dimensions(Inner Diameter*thickness*Length) | 2200*12*11044 |
Estimated Tare Weight (kg) | 13415 |
Payload(kg) | 20250 |
Total Weight(kg) | 33665 |
Wheelbase(mm) | 6720+1320 |
Shell of Tanker | |
Products | Liquefied Petroleum Gas (propane) |
Fluid Property | Flammable |
Design Temperature(℃) | 50℃ |
Design Pressure(MPa) | 1.61 |
Corrosion Allowance(mm) | 1.00 |
Weld Joint Factor | 1 |
Major Materials of Bearing Pressure | Tanker body:Q345R,12mm, |
End plate:Q345R,12mm,double ellipse | |
Main beam:16Mn | |
Detection | |
Heat Treatment | Overall treatment in a furnace,600℃ to 640 ℃ |
Flaw Detection | 100% Flaw detection |
Hydraulic Test(MPa) | 2.1 |
Manhole (As Customer’s Requirement) | |
Quantity | 1;on top,DN450 |
Safety Valve(As Customer’s Requirement) | |
Quantity | 2 |
Location | On the top of tanker |
Size | DN50 or As Customer’s Requirement |
Level Gauge |
|
Type | Manuel Opertion type |
Location | At the rear of the end plate |
Running System | |
Axles | 2*13T BPW |
Tire | 12R22.5 Tubeless tire , 9 including one spare tire |
Landing leg | JOST |
King Pin | #50 or #90 |
Control System | |
Emergency Cut-off Valves | 2 |
Ball Valve | 2 |
Liquid Gauge | 1 |
Pressure Indicating Thermometer | 1 |
Pressure Gage | 1 |
Accessories | |
Tool Box | 2 |
Wheel Carrier | 1 |
Fire Extinguisher | 2 |
Fender | 6 |
Paint | As Customer’s Requirement |
Standard: Pressure vessels, Supervision Regulation on Safety Technology for Stationary Pressure Vessels |
The picture of
L
2 axle 40.5M3 40500Liters LPG gas tank semi trailer which exported to Vietnam.
2 axle 40.5M3 40500Liters LPG gas tank semi trailer which exported to Bangladesh.
2 axle 40.5cbm 40500L 40000L LPG gas tanker semi trailer which exported to Mongolia.